Now a days, due to the shortage of electricity or power failure many industries face
hudge problems. To over come these, Central Govt. has sanctioned co-generation
plants, to many industries, to be self sufficient for their electrical needs. |
| |
| 1.Location of conveying :- For Bagasse based Boiler to convey the Bagasse
from Bagasse Elevator and existing RBC to new Boiler and From Bagasse
storage yard to boilers to generate electricity. |
| |
2.Scope of supply :- This system includes Turn key job of design, engineering,
manufacturing supply erection and commissioning with all electrical equipments. |
| |
| 3.Belt Sizes :- 500 mm to 2200 mm |
| |
| 4.Chain Conveyor :- 800 to 2000 mm effective width of chain and Slat conveyor. |
| |
| 5.Capacity :- Starts from 5 TPH to 150 TPH respectively. |
| |
| 6.Power Generated :- 10 MW to 52 MW. |
| |
| 7.Design :- System designed as per IS: 11592 and structural material (Belt, pulleys, idlers etc.) as per IS standards. |
| |
| Following codes and standards shall be followed :- |
| |
IS 11592(2000): Code of practices for the selection and design of the conveyor. |
| |
IS 1891 : Specification for rubber conveyor part-1. |
IS 477 : Specification for the troughed Belt Conveyor for surface installation part I and II ( For under Ground). |
IS 7155 : Code of the Practice for the Conveyor Safety. |
IS 8466 : Bagasse Carrier Chain. |
IS 8531 : Specification for pulley for Belt Conveyors. |
IS 8598 : Specification for the Idlers for Belt Conveyors. |
IS 14206 : Mechanical joining of plied textile reinforced Rubber Conveyor. |
IS 1554 : PVC insulated Cables. |
IS 3043 : Code of Practices of Earthing. |
| |
| Achievement :- |
| |
Group Engineers is proud to declare about the satisfactory working of the
system of 5 TPH to 150 TPH capacity in many plant. |
| |
The full proof system is complete as considering all the Design Parameters
such as the location, mean Baromatric pressure, Wind Velocity. Rainfall, Relative
Humidity and many other parameter. |
| |
The design manufacture testing and performance of the system shall comply
with all currently applicable status, regulating and safety codes in the locality where
the equipments will be installed. |
| |
The equipments offered by Group Engineers shall be capable for rated capacity
of Fuel & designed for smooth continuous operation with easy maintainence. |